Gryphon Membrane Slitting Erv Heat Exchanger Production Line

Product Details
Customization: Available
After-sales Service: One Year Free Warranty
Precision: High Precision
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Overseas Agent/Branch
The supplier has overseas agent/branch(s)
Overseas Services
The supplier provides overseas services and supports countries including Russion.

Overseas service content includes Debugging, Maintain, Training, Equipment Installation, Repair.
to see all verified strength labels (14)
  • Gryphon Membrane Slitting Erv Heat Exchanger Production Line
  • Gryphon Membrane Slitting Erv Heat Exchanger Production Line
  • Gryphon Membrane Slitting Erv Heat Exchanger Production Line
  • Gryphon Membrane Slitting Erv Heat Exchanger Production Line
  • Gryphon Membrane Slitting Erv Heat Exchanger Production Line
  • Gryphon Membrane Slitting Erv Heat Exchanger Production Line
Find Similar Products

Basic Info.

Model NO.
TY-DFO1
Condition
New
Certification
ISO, CE
Warranty
One Year Free Warranty
Automatic Grade
Automatic
Installation
Desktop
Driven Type
Electric
Keyword1
Gryphon Membrane Erv Heat Exchanger
Keyword2
Erv Heat Exchanger
Keyword3
Erv Heat Exchanger Production Line
Transport Package
Wooden Case Packing, Air Freight, and Sea Freight
Specification
2T
Trademark
Taiyuan Machinery (Dongguan) Co., Ltd
Origin
Dongguan City, Guangdong Province, China
Production Capacity
50PCS/Month

Product Description

Product Description
TY-DF01 Automatic assembly equipment for heat exchangers
Gryphon Membrane Slitting Erv Heat Exchanger Production Line
Gryphon Membrane Slitting Erv Heat Exchanger Production LineGryphon Membrane Slitting Erv Heat Exchanger Production LineGryphon Membrane Slitting Erv Heat Exchanger Production LineGryphon Membrane Slitting Erv Heat Exchanger Production LineGryphon Membrane Slitting Erv Heat Exchanger Production LineGryphon Membrane Slitting Erv Heat Exchanger Production LineGryphon Membrane Slitting Erv Heat Exchanger Production LineGryphon Membrane Slitting Erv Heat Exchanger Production LineGryphon Membrane Slitting Erv Heat Exchanger Production LineGryphon Membrane Slitting Erv Heat Exchanger Production LineGryphon Membrane Slitting Erv Heat Exchanger Production Line
Device parameters
Equipment model: DF01-ERV201
Total weight of the equipment: 2T
The device is divided into six parts
1. Paper cutting mechanism
2. A disc feeding and rolling mechanism
3. B disc feeding and rolling mechanism
4. Paper, AB material tray, end cover assembly mechanism
5. End cap dispensing mechanism
6. Finished product assembly line mechanism
Power supply voltage: AC200V - 240V
Total power of power supply: 1.5KW
Air pressure: 0.5 - 0.7 Mpa
Capacity: 20 - 25 Pcs/H

This equipment will realize: automatic paper cutting, automatic gluing, automatic assembly heat exchangers functions ;
The equipment adopts the online fully automatic design concept, and all processes are completed automatically.
1 Working source:AC220V
2 Working pressure :0.4-0.6 Mpa
3 Maximum power : 4KW
4 Productivity:
    ERV212:40-50pcs Finished Heat exchangers/H
    ERV366:30-40pcs Finished Heat exchangers/H
5 Lifetime:≥10years(Excluding consumables)

Safety precautions
This manual provides some information for users when using the TY-DF01 device. In order to ensure safe operation and smooth production, the following two points need to be noted:

1) It is forbidden for non-professionals or personnel who have not obtained relevant training certificates in electrical fields to open the electrical box. It is forbidden to make any changes to the electrical wiring and gas circuits in the electrical box.
2) It is forbidden to contact the moving parts of the machine parts with any part of the body during the operation of the machine, and if you need to check and repair, be sure to suspend the machine or turn off the power of the equipment. Repairs are carried out on a safe premise.

Preparation before production:

1. Cleaning and cleaning: Be sure to clean the work surface, check whether the cylinder joints and moving parts are loose, and tighten them if there are abnormal and loose parts.
2. If there is oil stain in the moving part of the cylinder, please wipe the oil dirt with a rag, and then lubricate the oil on the moving part of the cylinder again.
3. Ventilation: dry and clean air source, range: 0.5-0.7 Mpa. Operation method: Push forward the hand slide valve on the right side of the machine near the air conditioning combination triplet by hand, and the pressure display gauge on the triplet shows the range of 0.5-0.7 Mpa.
4. Power-on: power supply range: AC220V±0.5%, 50HZ. Operation method: Turn on the power of the three operation panels of the equipment and turn on the four-axis robot, and the equipment has been successfully powered on. The operation process of the four-axis robot: the key lock key is aligned automatically, and then press the start button. Other operating functions must be familiar with the operation manual of the Zhongweixing four-axis robot

Common alarms and handling methods
The following table lists common general alarms and how to resolve them:
serial number phenomenon Solution
1 During the production process, the system stops automatically, and the information is displayed on the touch screen: There is a shortage of material in the A tray area
  1. Press the pause button
  2. Manually adjust the loading until the fiber is sensing, and then it can be started
2 During the production process, the system stops automatically and the information is displayed on the touch screen: there is a shortage of material in the B tray area
  1. Press the pause button
  2. Manually adjust the loading until the fiber is sensing, and then it can be started
3 In manual or automatic mode, the servo motor stepper motor has no action regardless of forward or reverse rotation
  1. 1. If there is a foreign object at the photoelectric switch at the left limit and the right limit, remove the foreign matter
  2. 2. Check whether the wire from the motor wire to the stepper driver is loose or disconnected
  3. Check whether the indicator light on the motor driver is red, if it is red, it is an alarm, and it is recommended to power off and power on again
4 There is a deviation in the loading alignment
  1. 1. Check that there may be oil stains on the focusing lens of the notched optical fiber, and wipe the surface clean with a rag
  2. If there is still no problem after 1 treatment, it is recommended to loosen the optical fiber fixing block with an Allen screwdriver and readjust the position of the optical fiber
 Company Profile:
TAIYUAN MACHINERY EQUIPMENT(DONGGUAN)CO.,LTD is the subsidiary of TAIYUAN GROUNP(CHINA)CO.,LTD.The TaiYuan machinery company is located in 'the world factory'Dongguan City, the the Pearl River Delta region of China, adjacent to Hong Kong and Macao.
We have over 30 years in producing Chemical, and aviation equipments;Simulated climate testing and Size measuring equipments;Automated production equipments;Food production equipments etc.,those are widely used for scosmetics, food,chemical  aviation,biology, pharmaceuticals etc.Especially our independently developed aviation solid propellant mixer and liquid metal, molten salt high-temperature magnetic transmission pump are hot selling and getting so good sales volume in USA, South America,North America, Europe,Rssia,Southeast market etc,
Our company has 6000m2 working shop,with lSO, CE European certification and Manufacture License forpressure machines.We have all kinds of technical personnel.resea

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier