Programmable High and Low Temperature Cycle Test Chamber

Product Details
Customization: Available
After-sales Service: One Year Free Warranty
Power Supply: 220V
Gold Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Overseas Agent/Branch
The supplier has overseas agent/branch(s)
Overseas Services
The supplier provides overseas services and supports countries including Russion.

Overseas service content includes Debugging, Maintain, Training, Equipment Installation, Repair.
to see all verified strength labels (14)
  • Programmable High and Low Temperature Cycle Test Chamber
  • Programmable High and Low Temperature Cycle Test Chamber
  • Programmable High and Low Temperature Cycle Test Chamber
  • Programmable High and Low Temperature Cycle Test Chamber
  • Programmable High and Low Temperature Cycle Test Chamber
  • Programmable High and Low Temperature Cycle Test Chamber
Find Similar Products

Basic Info.

Model NO.
TY-80BT
Certification
CE, ISO
Warranty
1 Year
Keyword1
High and Low Temperature Test Chamber
Keyword2
High and Low Temperature Tensile Test Chamber
Keyword3
Test Chambers
Transport Package
Wooden Case Packing, Air Freight, and Sea Freight
Specification
W400× H500× D500mm
Trademark
Taiyuan Machinery (Dongguan) Co., Ltd
Origin
Dongguan City, Guangdong Province, China
Production Capacity
50PCS/Month

Product Description

Product Description
TY-80BT High and low temperature test chamber
Programmable High and Low Temperature Cycle Test ChamberProgrammable High and Low Temperature Cycle Test ChamberProgrammable High and Low Temperature Cycle Test Chamber
Control mode and features:

The series of high and low temperature test boxes is designed and manufactured according to user requirements and according to JB / T4283-91; GB / T14294-93. Mainly used for manufacturing and maintaining a constant temperature space, the refrigeration, heating and other complete automatic control. Its working principle is to use the balanced temperature control control system (BTC), to P.I.D. The SSR is controlled so that the heat of the system is equal to the heat loss, so it can be used stably for a long time.
1. Refrefers to the measured data at room temperature of 20ºC and no load
1.1 Temperature range: -40ºC ~150ºC
1.2 Temperature fluctuation degree: ± 0.5ºC
1.3 Temperature deviation: ± 2ºC
1.4 Heating time: 40 minutes from-40ºC to 150ºC (no load)
1.5 Cooling time: it takes about 65 minutes from + 20ºC to-40ºC (when no load)
2. Structure and material:

 
type inside dimension external dimension
RTP-80BT W 400×H 500×D 500mm According to the size
2.1 Inner material: stainless steel fog plate (SUS # 304 1.0mm thick);
2.2 Outer box material: electrolytic steel plate spraying;
2.3 Thermal insulation material: 100mm hard Polyurethane foam + asbestos board, play the dual effect of thermal insulation and heat resistance;
2.4 Air supply air circulation system:
2.4.1 One 60 W cycle motor plays the role of symmetrical blow-out to ensure the requirement of high precision uniformity
2.4.2 Long-stainless steel shaft
2.4.3 Multi-wing fan blade (SIRCCO FAN), with small noise and large air volume
2.4.4 Bi-directional adjustable louver to ensure uniform temperature distribution at each point in the test box
2.5 Box door: single door, single window, left open, buckle handle on the right side
2.5.1 Observation window 22040040mm, 3 layers of vacuum layer, effectively reduce energy consumption;
2.5.2 The buckle handle, small in size, does not occupy space, convenient to open and the box door is opened without vibration;
2.5.3 Rear button: SUS # 304;
2.5.4 Door frame, box door and window contain built-in defrosting line to effectively prevent low-temperature condensation;
2.6 Other accessories: the aperture of the top and bottom of the test box, the aperture size of ¢ 50mm, the edge of plane stainless steel sheath, including two 50mm silicone plug heads.
3. refrigeration system:
3.1 Compressor: The refrigeration compressor adopts one French Taikang low-temperature compressor to form the refrigeration system. France Taikang compressor has the characteristics of compact structure, small vibration, low noise, high energy efficiency ratio, and high cooling capacity in low temperature working conditions. The optimized design of refrigeration system is conducive to reducing operation costs and increasing reliability;
3.2 Chromer: R404A effectively protects the bromine gas content in the atmosphere and supports environmental protection;
3.3 Condenser: fin type attached cooling motor front air inlet and behind the air effectively reduce the accent;
3.4 Evaporator: fin type multi-segment automatic load capacity adjustment;
3.5 Other accessories: desiccant, refrigerant flow window, repair valve;
3.6 Expansion system: the capillary controls the refrigerant flow rate.
4. navar:
4.1 Temperature controller: Touch-type programmable controller TEMI580;
4.1.1. 5-inch color touch screen;
4.1.2. Two control modes (fixed value / program);
4.1.3. Sensor type: PT 100 sensor (optional electronic sensor);
4.1.4. Alarm signal: 4 DI external fault alarms;
4.1.5. Temperature measurement range: -90.00ºC - -200.00ºC, (-90.00ºC - -300.00ºC can be customizable)
Error of ± 0.2ºC;
4.1.6. Humidity measurement range: 1.0% - -100% RH, error ± 1% RH (humidity control can be added in this model);
4.1.7. Interface language type: Chinese / English;
4.1.8. With Chinese character input function;
4.1.9. A variety of signal combination relay output, the signal can be logical operation (NOT, AND, OR, NOR, XOR), referred to as PLC programming ability;
4.1.10. Communication interface: RS232;
4.1.11. Program editor: 10 groups of programs, each group of programs can be compiled up to 12 paragraphs;
4.1.12. External Size: 180120100 (mm) (length, width and depth);
4.1.13. Installation opening size: 170110 (mm) (length and width);
4.1.14. TFT resolution: 480,272 k color.
4.2 Heater: stainless steel heating wire, automatic calculation high accuracy PID + SSR control (calculation cycle: 1~4S can be set), so that the heat loss is equivalent to the heat added, so the power saving is about 10% than the traditional ON / OFF control;
4.3 Temperature measuring body: Taiwan high precision DIN specification class A ψ 4.8m m SUS # 304 stainless steel PT 100Ω 1 branch;
4.4 Safety device: When the test box fails, provide the following safety protection and issue an alarm;
4.5 Personal safety protection
4.5.1 Leakage circuit breaker;
4.6 Equipment safety protection
4.6.1 Fluid power controller of the zero gate
4.6.2 Heat the air burning to prevent the protection device
4.6.3 Compressor high-voltage protection switch
4.6.4 Compressor overheating protection switch
4.6.5 Compressor over-current protection switch
4.6.6 Switch-type fuse
4.6.8 Line fuse and full sheath terminals
4.6.9 Beeper with flash for alarm
5. standard layout:
5.1, power cord 4.0 mm (3 core), low impedance rubber cable 5m long 1;
5.2 LED energy-saving lighting window light in one group;
5.3 One set of fuse (vulnerable parts);
5.4 One set of controller operation manual, one set of operation manual and one test report.
5.5 Control panel configuration: TEMI580 one controller, one power switch, one lighting switch, one RS232 interface, one leakage circuit breaker.
Vi. Equipment service conditions:
6.1 Single-phase three-line system 220V ± 10%; 50 Hz;
6.2 Temperature: 5~35ºC, Humidity: <90%R.H ;
6.3 No use conditions: test and storage of inflammable, explosive and volatile substances samples; test and storage of samples of corrosive substances; test or storage of biological samples; test and storage of samples of strong electromagnetic emission sources; and no strong vibration around.
Vii. Standards met by the equipment:
The equipment meets GB2423.1-89 Electrical and Electronic Products test A: Low temperature test method, GB2423.2-89 Electrical and Electronic Products Test B: high temperature test method
VIII. Training:
.18 Purpose: to fully meet customer needs, to achieve customer satisfaction purpose;
.28 Responsibilities: Provide customers with equipment spare parts, spare parts and related technical data. Responsible for arranging and organizing the pairs of customers
 Technical training;
.38 Training: free technical training on on-site operation and maintenance for users, so that customers can understand the performance of the equipment, teach them to use and maintain the equipment correctly, and avoid the failure caused by improper use.
Ix. Site installation and commissioning
.19 Installation: All equipment provided in the contract shall be installed by the Seller, and the Buyer shall send technical personnel to assist in the installation of the whole set of equipment, and the Buyer's personnel shall timely provide necessary assistance during the installation;
.29 Site commissioning: within two weeks after the equipment arrives at the Buyer's site and the Buyer notifies the Seller, the Seller shall complete the commissioning, so as to meet the normal use requirements of the Buyer and the contract requirements.
X. Acceptance criteria and methods:
.1 10 After the seller's products pass the manufacturing inspection, the seller shall deliver the package to the buyer for acceptance at the buyer's site;
.2 10 The final acceptance report shall be jointly issued by the Buyer and the Seller;
.3 10 After passing the acceptance inspection, both parties shall fill in the delivery form and handle the delivery procedures.
After-sales service commitment
  1. The quality guarantee period is one year, starting from the date of formal delivery;
  2. During the warranty period, in addition to the damage caused by natural disasters, abnormal power, improper use, improper maintenance and other factors, the company completely free of charge;
  3. Free to provide users with the required use and maintenance consultation;
  4. Timely to provide users with wearing parts, spare parts, to provide spare parts for life;
  5. During the work of the test box, in case of the test system failure, our company should immediately give a reply after receiving the notice, and send the maintenance engineer to the site within 24 hours (depending on the status of the work assignment) to help the user with the equipment testing and maintenance to realize the normal operation of the equipment;
  6.  Our company will regularly send maintenance engineers for users of free door-to-door maintenance, maintenance;
  7. After the shelf life, for the user lifetime maintenance, but discretionary maintenance and material costs.
Company Profile:
TAIYUAN MACHINERY EQUIPMENT(DONGGUAN)CO.,LTD is the subsidiary of TAIYUAN GROUNP(CHINA)CO.,LTD.The TaiYuan machinery company is located in 'the world factory'Dongguan City, the the Pearl River Delta region of China, adjacent to Hong Kong and Macao.
We have over 30 years in producing Chemical, and aviation equipments;Simulated climate testing and Size measuring equipments;Automated production equipments;Food production equipments etc.,those are widely used for scosmetics, food,chemical  aviation,biology, pharmaceuticals etc.Especially our independently developed aviation solid propellant mixer and liquid metal, molten salt high-temperature magnetic transmission pump are hot selling and getting so good sales volume in USA, South America,North America, Europe,Rssia,Southeast market etc,
Our company has 6000m2 working shop,with lSO, CE European certification and Manufacture License forpressure machines.We have all kinds of technical personnel.resea

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier